THREADER RAIL MACHINE MQ-PC-12
In the renewing track operations, once we have removed the old track by means of the gantries, and have set the new sleepers onto the railroad bed, the next step consists of lifting and placing the two rails, that were just laid alongside the temporary track, onto their final position on the ties. In the past, this task was made by human groups of six or eight persons. The problem was solved, thanks to the Threader Rail Machine which ...
|
|||||||||||||||||||